cdu waste heat boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

cdu waste heat boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


cdu waste heat boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
steam boilers for sales johannesburg - motionmakers.co.

steam boilers for sales johannesburg - motionmakers.co.

heat exchanger worcester boiler. china boiler supplier cdu waste heat boiler. industrial use heat conduction oil furnace hot oil boiler. bath residential hot water boilers hot water boiler for hotel. wholesale city gas fired steam boiler for power station

KIRCHNER Reference Li

KIRCHNER Reference Li

CDU, ARDS & HCDU Units 1212‐A‐610 Waste Heat Boiler 2015 Kirchner Italia B‐7870 A PETRONAS Johor Malaysia Sinopec Engineering (Group) Company Ltd. Rapid Package 2 ‐ CDU, ARDS & HCDU Units 1211‐A‐610 Waste Heat Boiler 2015 Kirchner Italia B‐7869 D …

Waste heat recovery un

Waste heat recovery un

A waste heat recovery unit (WHRU) is an energy recovery heat exchanger that transfers heat from process outputs at high temperature to another part of the process for some purpose, usually increased efficiency.

(PDF) Tugas Umum Pertamina RU VI | Shinta Rizki Huta

(PDF) Tugas Umum Pertamina RU VI | Shinta Rizki Huta

Tugas Umum Pertamina RU VI. Shinta Rizki Hutami. Download with Google Download with Facebook or download with email

Zhengzhou Boiler Co.; Ltd - zgaacautoclave.c

Zhengzhou Boiler Co.; Ltd - zgaacautoclave.c

cdu waste heat boiler. Date: 06-15-2017 . ZG Boiler Factory is a 70 years \' history industrial boiler and pressure vessel boiler manufacturer in China. The production of steam boiler, hot water boiler, water tube boiler, fire tube boiler, biomass fired b

Pre-commissioning of Waste Heat Recovery Boilers at Indo-Gu

Pre-commissioning of Waste Heat Recovery Boilers at Indo-Gu

Home Projects Completed Pre-commissioning of Waste Heat Recovery Boilers at Indo-Gulf… Pre-commissioning of Waste Heat Recovery Boilers at Indo-Gulf Fertilisers Pre-commissioning cleaning is important to ensure that the plant can be started without issues

MC

MC

Hot Spot found on Existing Refractory in Cone Area of the Waste Heat Boiler at south side near Cold Collector Flange renewed with New Anchors and Refractory. 8C501 RERUN MAIN COLUMN: 6” Redundant Nozzle was blanked off from inside by welding insert plate

MIDOR | EPR

MIDOR | EPR

Egyptian Projects Operation and Maintenance (EPROM) is the largest operation and maintenance company in Egypt and North Africa in the fields of oil refineries, petrochemical plants, fertilizer factories, gas plants as well as the management of marine term

LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRI

LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRI

baroda heat-up controls pvt. ltd list of jobs executed refinery/hydrocarbon industries sr. no client year type of job type of plant inspected by 64 indian oil corporation ltd, mathura thru.

Factors Affecting Claus Waste Heat Boiler Design and Operati

Factors Affecting Claus Waste Heat Boiler Design and Operati

The Claus Waste Heat Boiler (WHB) is a critical piece of equipment in a Sulphur Recovery Unit (SRU); its fundamental purpose is as a heat transfer device used in energy recovery. Sulphur plant operators have recently been experiencing higher than normal W

A Brief Overview Ronald (Ron) F. Colwell, P

A Brief Overview Ronald (Ron) F. Colwell, P

CDU Process • Process Objective: – To distill and separate valuable distillates (naphtha, kerosene, ... – Heat the crude to the desired temperature using fired heaters ... 6 Flue gas to CO boiler Heavy fuel oil; carbon black processing Slurry Oil 4 - 12 1

boiler 15 tph | Manufacturer of Biomass Fired Boil

boiler 15 tph | Manufacturer of Biomass Fired Boil

Welcome to Fulton UK 2019-3-18 · introducing fulton's all-new double-award-winning vsrt the world's best steam boilerHunt Boilers - Forbes HuntFulton specialise in the provision of high quality products and custom engineered solutions for industrial and c

boilers suppliers in egypt - sigmaster.

boilers suppliers in egypt - sigmaster.

foam products steam atmospheric pressure fire tube boiler in Norway; how to estimate coal boiler efficiency; boiler suppliers china in Turkey; Two Drum Biomass Steam Boiler Best Service; small steam boiler in Kosovo; cdu waste heat boiler; Customized Luxu

Zhengzhou Boiler Co.; Ltd - AAC block pla

Zhengzhou Boiler Co.; Ltd - AAC block pla

ZG Boiler Factory is a 70 years \' history industrial boiler and pressure vessel boiler manufacturer in China. The production of steam boiler, hot water boiler, water tube boiler, fire tube boiler, biomass fired boiler, oil and gas fired boiler, chain gra

What is a Waste Heat Boiler? (with picture) - wisegeek.c

What is a Waste Heat Boiler? (with picture) - wisegeek.c

A waste heat boiler uses the heat formed as a byproduct of another process, heat which would normally be wasted, and uses it to create steam. The steam can be used to drive turbines which produce electricity. Alternatively, the boiler can simply be used t

Waste Heat Boiler - Process Combustion Corporati

Waste Heat Boiler - Process Combustion Corporati

The boiler feed water economizer is basically a gas-liquid heat exchanger located after the boiler evaporator section. The economizer also uses a portion of the energy contained in the thermal oxidizer combustion gases (after the waste heat boiler) to pre

Working with industry: Dunkirk’s industrial waste he

Working with industry: Dunkirk’s industrial waste he

Working with industry: Dunkirk’s industrial waste heat network (France) ... a coal-fired boiler, the recovery of steel production gas from Usinor blast furnaces, the recovery of heat produced by the Gravelines nuclear plant and recovery of Usinor waste he

14 tph boiler | Industrial Oil Gas fired Boiler manufactur

14 tph boiler | Industrial Oil Gas fired Boiler manufactur

Advantages and disadvantages of diesel engine and waste heat recovery boiler and cooling waterCENTRAL PUBLIC WORKS DEPARTMENT …2014-9-4 · GOVERNMENT OF INDIA CENTRAL PUBLIC WORKS DEPARTMENT ANALYSIS OF RATES FOR DELHI (VOL -1) 2014 Published Under The Aut

Claus waste heat boiler economics Part 1: proce

Claus waste heat boiler economics Part 1: proce

Claus waste heat boiler economics Part 1: process considerations (White Paper) - The design of the waste heat boiler has a critical role to play in determining process operations, reliability and economic performance in the sulphur recovery unit.....

ENERGY SAVINGS AND ECONOMIC BENEFITS OF

ENERGY SAVINGS AND ECONOMIC BENEFITS OF

feed pump, E-22=MPS steam generator feed pump, CRU WHB=Catalytic Reforming Unit waste heat boiler, HPS=High pressure steam, COB=Co-Boiler) Boiler feed water (BFW) is usually composed of returned condensate and make-up water. The BFW normally contain impur

Sulphur Recovery Unit | Furnace | Sulfur - Scri

Sulphur Recovery Unit | Furnace | Sulfur - Scri

diagram of sulphur recovery unit hp steam (42 kg/cm2) 1400 oc lp steam waste heat boiler 322 oc 180 oc reaction furnace. sour gas. bfw. ist condenser 208 oc. bfw. 232 oc. ist converter. 2nd converter tail gas to tgtu 132 oc. air blower. hp steam ist rehea